Show More
POWER PROJECTS REFERENCES
Show More
ELECTRICAL PROJECTS REFERENCES
EKO TOWERS - TOTAL head Office
Supply of Legrand Panels, Switchgear components, Legrand Wiring DevicesEtco Nig Ltd - Zenon House Project
Supply of Low Voltage Panels and Light fittings for 12 story office buildingsMAR & MOR Cornerstone Project-Office
Supply of Low Voltage panels, Legrand UPS, AVR and Wiring DevicesShow More
UPS PROJECTS REFERENCES
Office of the Governor of Ekiti Stat
UPS Systems & Elevator20KVA x 1 & 30KVA x 1
ETCO NIGERIA LTD
UPS Systems 30KVA x 1 & 15KVA x 5Jak's Club
UPS Systems & Elevator80KVA x 1
VALID CARD NIGERIA LTD
UPS Systems, AVR & Panels 60KVA x 4POLARIS BANK LIMITED
UPS Systems & AVR10KVA x 8 & 15KVA x 1
MAR & MORE INTEGRATED SERVICES
UPS Systems & AVR20KVA x 4 & 40KVA x 1
DHL International (Nigeria) Ltd
UPS Systems & AVR30KVA x 1
TFCC Development
UPS Systems30KVA x 2 & 60KVA x 2
KUBER DEVELOPER LTD
UPS Systems & Elevator15KVA x 4
Show More
ELEVATORS & ESCALATORS PROJECTS REFERENCES
Abeokuta Mall –VACC Technical
4 Elevators 1600KG, 3 stops, 1m/s3 Elevators panoramic 1000KG, 4 stops, 1m/s 8 Escalators
40AB Bourdillion–Kuber Development
3 Elevators 1150KG, 2.5m/s, 23 floors 1 Elevator 1600KG, 2m/s, 23 floorsAdmiralty Care Hospital
5 Elevators 1600KG, 6 stops, 1.6m/s1 Elevator 1000KG, 5 stops, 1m/s
1 Elevator/Car Lift 3500KG, 4 stops, 1m/s
NDIC –Sageto Limited
5 Elevators 1600KG, 17 stops, 2m/s 1 Elevators 1000KG, 17 stops, 2m/s 1 Elevators 1275KG, 17 stops,2m/sShow More
POLY PRODUCT NIGERIA LIMITED
CSD125 & N502 BOOSTER – 9.4 m3/min @ 36bar.MILA GROUP
ASK34 & TD51 dryer – 3.4 m3/min @ 8barSIPERICO NIGERIA LIMITED
N253 – 2.3 m3/min @ 36barShow More